Project: Aspen Lofts, Boise, Idaho
General Contractor: Apex Enterprises,
Boise, Idaho
Description: Premier downtown loft
condominiums. Seventeen story condominium tower with lower levels
of retail, offices and parking garages.
Special features: Post-tensioning
system; building width increases from 32 feet at ground level
to 53 feet at the top.
| Scope |
• |
Purchase concrete |
• |
Layout
vertical and horizontal form work |
• |
Pour, place, and finish concrete |
| Project Challenges |
| • |
Site located on state highway (in downtown
Boise) with 40,000 cars per day traffic count. This resulted
in an inability to get permits to close the street for deliveries.
|
| • |
Pump trucks delivered concrete from 11 p.m.
to 5 a.m. |
| • |
Pours required working at night, split crews,
no full-time night crew; |
| • |
Due to a lack of storage space for materials,
materials had to be brought to the site on demand. |
| • |
Dealt with additional government regulations
due to project location within multiple governmental jurisdictions. |
| • |
Due to cold winter temperatures used 1.3 million
BTU heaters to cure concrete during winter months. |